What this work involves
Discuss changes in level, support structure, drainage and access underneath. Choose materials for use and maintenance.
- Timber, composite or stone
- Substructure and drainage
- House and garden junctions
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate outdoor work with the house programme and final indoor-outdoor junctions.
What the drawing needs to explain
Use the same room and detail numbers on drawings and in the room book. Identify the approved revision for each item and which supplier still needs to provide information.
Allow for later maintenance
Organise product and care information by the same room structure. Documentation then remains useful when only one element is replaced later.
Cost factors for this service
Costs depend on area, substructure, materials and detailing. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for terraces & decking. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging terraces & decking?
A level transition to the house also needs appropriate drainage. Develop that junction for the selected finished level.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

