Building & renovation in het GooiA considered plan · Clear agreements0640125121
AannemerHet GooiVerbouw & renovatie
Glossary · het Gooi

Building terms, clearly explained.

Short definitions for words used in plans and proposals.

Architectural concept for inspiration
Connection detail
A drawing or specification of the junction between building elements.
Finishing
Work after the structural base, including walls, ceilings, floors and painting.
Building survey
A record of the existing situation and visible issues before design.
Structural engineer
A specialist assessing the load-bearing structure and developing calculations and details.
Load-bearing wall
A wall forming part of the supporting structure. Its function must be assessed before alteration.
Movement joint
A deliberate separation allowing movement between elements.
Reveal
The side of an opening around a window or door.
Vapour control layer
A layer limiting water-vapour movement; suitability depends on the complete build-up.
Foundation
The part transferring building loads to the ground.
Glazed screen
A facade element comprising windows and possibly opening doors.
Timber frame
A building system in which a timber framework forms an important part of the structure.
Insulation value
A thermal property that should only be compared with clear material or element assumptions.
Thermal bridge
A place where heat passes relatively easily through the envelope.
Layout plan
A drawing showing the distribution of tiles, flooring or other elements.
Additional work
Work recorded as a change to the agreed scope.
Handover
Review and transfer of completed work, with outstanding items recorded.
Datum
An agreed reference level used to coordinate heights.
Prefabrication
Manufacturing elements away from the site; it does not by itself define the finish level.
Thermal resistance
A measure of resistance to heat flow, dependent on the complete build-up.
Structural shell
The main building construction before finishes.
Ground investigation
Information about the ground used in assessment and design.
Provisional sum
An allowance for work not yet fully defined, with an agreed basis for adjustment.
U-value
A measure of heat transmission; lower means less transmission under comparable assumptions.
Construction drawing
A drawing containing the dimensions and details required for execution.
Ventilation
Intended supply, transfer and extraction of air suited to the building and its use.
Your next step

A good building plan starts with your story.

Tell us what you would like to change. An initial idea is enough to begin the discussion.

Discuss your project
Call usDiscuss your project