What this work involves
The engineer needs reliable existing and proposed information. Coordinate calculations and drawings and identify what still needs checking on site.
- Existing structure and records
- Proposed change and loads
- Calculations and drawings
- Connections and bearings
- Design and permission coordination
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Use a shared revision register for designers, suppliers and construction.
What the drawing needs to explain
Use the same room and detail numbers on drawings and in the room book. Identify the approved revision for each item and which supplier still needs to provide information.
Decide this before construction
Prioritise decisions affecting several rooms before individual product choices. Then use room-by-room decision dates linked to the work that would otherwise wait.
Compare the complete intervention
Compare quotations by room and by trade. Check that interfaces such as making good walls after service work are included exactly once, with clear responsibility.
Cost factors for this service
Complexity, missing information and scope determine the work. Design changes may require revisions.
Bring this to the discussion
Plans, photographs, existing calculations and the proposed alteration.
Questions about the work
Can calculations start before the design?
Early advice can help, but final calculations need sufficiently defined dimensions, loads and design choices.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.