Building & renovation in het GooiA considered plan · Clear agreements0640125121
AannemerHet GooiVerbouw & renovatie
More space · het Gooi

Roof extensions in het Gooi

Adding another floor requires a coordinated plan for structure, access and the way the new rooms will be used.

Architectural concept for inspiration
General technical preparation

What this work involves

An extra storey changes more than the roof. The existing structure, staircase position, escape arrangements and installation routes need to be considered together. Establish what the building can support before settling the design.

  • Existing structure and foundation assessment
  • Stair opening and usable room layout
  • Roof shape and neighbouring buildings
  • Facade materials, windows and insulation
  • Lifting, scaffolding and temporary weather protection
When this work forms part of a larger renovation

Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.

Include an addition in the room book for the entire home from the start.

Which trade-off matters?

A continuous material palette brings calm, but rooms serve different uses. Decide which qualities should remain consistent and where moisture, sound or intensive use calls for a different solution.

What the drawing needs to explain

Use the same room and detail numbers on drawings and in the room book. Identify the approved revision for each item and which supplier still needs to provide information.

Decide this before construction

Prioritise decisions affecting several rooms before individual product choices. Then use room-by-room decision dates linked to the work that would otherwise wait.

Cost factors for this service

Include design, investigations, structural work, the new envelope and internal finishes. Additional strengthening can change the budget.

Bring this to the discussion

Existing plans, photographs of roof and facades, intended rooms and information about earlier alterations.

Questions about the work

Is every flat roof suitable for another floor?

No. The building, its foundation and the rules for the property are decisive. Structural assessment and a location-specific permit check belong in the preparation.

The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

Your next step

A good building plan starts with your story.

Tell us what you would like to change. An initial idea is enough to begin the discussion.

Discuss your project
Call usDiscuss your project