What this work involves
Have a specialist assess required functions and existing conditions. Record products, junction details and checks before concealing components.
- Required function and design
- Doors, joints and penetrations
- Documentation and inspection
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Bring connection points, controls and maintenance access together on room sheets.
Decide this before construction
Prioritise decisions affecting several rooms before individual product choices. Then use room-by-room decision dates linked to the work that would otherwise wait.
Allow for later maintenance
Organise product and care information by the same room structure. Documentation then remains useful when only one element is replaced later.
Cost factors for this service
Costs depend on requirements, penetration count, access and reinstatement. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for passive fire protection & penetrations. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging passive fire protection & penetrations?
Individual product claims do not establish the performance of the complete element. Request an appropriate system and installation checks.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

