What this work involves
Collect photographs, circumstances and previous repair details. Determine which investigation method suits the pipes, roof or facade.
- Symptoms and leak history
- Investigation method
- Report and repair proposal
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Record existing defects by room so repairs do not become a disconnected project.
Decide this before construction
Prioritise decisions affecting several rooms before individual product choices. Then use room-by-room decision dates linked to the work that would otherwise wait.
Allow for later maintenance
Organise product and care information by the same room structure. Documentation then remains useful when only one element is replaced later.
How to review the result
Use the room book as a handover checklist. Review transitions first and individual products afterwards; a fully supplied room can still have a missing junction.
Cost factors for this service
Costs depend on investigation time, access, method and follow-up work. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for leak detection & investigation. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging leak detection & investigation?
Leak detection and repair are different scopes. Establish whether repair, opening-up and reinstating finishes are included.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

